Pharmaceutical

Becton Dickinson
- Location: Columbus, NE
- General Contractor: Hawkins Construction
- Architect:
- Engineer: Engineering Technologies
Hawkins Construction chose Ryan & Assoicates for the addition and renovation of BD’s new glass sterilization process. Specialty construction activities included: stainless steel lined hot boxes (Cold Rooms); ETO Sterilization Process with separate centralized control room; conductive epoxy flooring; separate exhaust and supply systems with purge capabilities; and LEL and PPM Gas Monitoring Systems through MSA and California Analytical furnished controls.